NOTICE: This version of the NSF Unidata web site (archive.unidata.ucar.edu) is no longer being updated.
Current content can be found at unidata.ucar.edu.
To learn about what's going on, see About the Archive Site.
NOTE: The nws-changes
mailing list is no longer active. The list archives are made available for historical reasons.
097 NOUS40 KWBC 031722 FOS/NOAAPORT NOTICE NO. 1683 MAY 3... 2000 ATTENTION FAMILY OF SERVICES SUBSCRIBERS/NOAAPORT USERS SUBJECT GOES-L LAUNCH UPDATE SUMMARY OF ACTIVITIES GOES-L WAS SUCCESSFULLY LAUNCHED AT 124/070700Z. THE APOGEE WAS APPROXIMATELY 70 KM HIGH OVERALL AN EXCELLENT RIDE FROM THE ATLAS/CENTAUR. FOLLOWING SEPARATION THE SEQUENCE OF COMMAND ACTIVITIES LEADING UP TO SOLAR ARRAY DEPLOYMENT WERE SUCCESSFULLY EXECUTED 30 MINUTES AHEAD OF SCHEDULE WITH A MAXIMUM DOD OF 21/PERCENT SIGN/ ON THE BATTERIES WELL BELOW THE 60/PERCENT SIGN/ MAXIMUM ALLOWABLE DOD AND CONSISTENT WITH GOES-9 AND GOES-10 LAUNCHES. INITIAL ACQUISITIONS AT DIEGO GARCIA... PERTH... AND CANBERRA OCCURRED RIGHT ON THE PREDICTS. THREE-WAY DOPPLER BETWEEN DIEGO GARCIA AND CANBERRA WAS SUCCESSFULLY PROCESSED BY FLIGHT DYNAMICS TO AID IN QUICKLY DETERMINING A POST-SEPARATION ORBIT. INITIAL COMMANDING WAS PERFORMED THROUGH DIEGO TO INITIALIZE THE ATTITUDE AND ORBIT CONTROL ELECTRONICS /AOCE /NUMBER SYMBOL/1/... VENT THE PROPELLANT LINES... PERFORM 300 MSEC THRUSTER FIRINGS USING THE PRIMARY THRUSTERS... COMMAND AN OFF-AXIS SUN ACQUISITION... AND DEPLOY THE SOLAR ARRAY OUTER PANEL. ALL COMMAND SEQUENCES WERE PERFORMED FLAWLESSLY AND THE SPACECRAFT RESPONDED AS EXPECTED. FOLLOWING SOLAR ARRAY DEPLOYMENT... A COMMAND HAND-OVER TO CANBERRA WAS PERFORMED TO SUPPLY FLIGHT DYNAMICS SUFFICIENT DATA TO DETERMINE A POST-LAUNCH ORBIT. SPACECRAFT CONFIGURATION AOCE 1 ON DIRA 1 ON CASS 1 ON DSS 1 ON ES 1 ON SIDE-A THRUSTERS SELECTED NORMAL SUN ACQUISITION MODE OUTER PANEL SOLAR ARRAY DEPLOYED TRIM TAB SLEWED TO 0 DEGREES RANGING ENABLED THROUGH CANBERRA UPCOMING ACTIVITIES 1/ 1 APOGEE ATTITUDE RE-ORIENTATION AND SIDE-B THRUSTER TESTS MAY 3 1330Z 2/ AMF 1 MAY 5 0315Z ANOMALIES/CONCERNS NONE MISCELLANEOUS SIGNIFICANT EVENTS TIMELINE /EVENTS WILL BE DROPPED AS THEY ARE COMPLETED/ CIRCULARIZE ORBIT MAY 3 MAY 21 AMF 1 MAY 5 AMF 2 MAY 7 AMF 3 MAY 9 AAM - MAY 11 TRIM 1 MAY 18 TRIM 2 MAY 19 TRIM 3 MAY 21 DEPLOYMENTS MAG BOOM AND FINAL SA DEPLOYMENT MAY 12 DIPOLE ESTIMATION MAY 13 MOMENTUM WHEEL TURN-ON AND SOLAR SAIL DEPLOYMENT MAY 14-15 GOES-L WILL BECOME GOES-11 MAY 11 OUTGASSING MAY 12 JUNE 9 INSTRUMENT CONTAMINATION AVOIDANCE MAY 14 20 START-UPS AND FUNCTIONAL TESTS MAY 12 MAY 21 FIRST OFFICIAL IMAGE MAY 17 GOES-L HOTLINE 301-867-0086 RICHARD G. REYNOLDS CHIEF... GROUND SYSTEMS DIVISION END NNNN ---------- End Forwarded Message ----------
nws-changes
archives: