NOTICE: This version of the NSF Unidata web site (archive.unidata.ucar.edu) is no longer being updated.
Current content can be found at unidata.ucar.edu.
To learn about what's going on, see About the Archive Site.
NOTE: The nws-changes
mailing list is no longer active. The list archives are made available for historical reasons.
Topic: GOES-10 to GOES-11 Transition Plan Message Issued: May 10, 2006, 1900 UTC Satellites Impacted: GOES-10 and GOES-11 Products Impacted: GOES-10 and GOES-11 Imager and Sounder Data and Associated Products including AWIPS Date/Time of Initial Impact: On or About June 27, 2006. ----------------------------------------- Details: ***GOES-11 is scheduled to replace GOES-10 as the GOES-West operational spacecraft on June 27, 2006*** (The exact time to be determined, but likely in the 1800-1900Z time frame) This message is to provide additional information on a planned transition from GOES-10 to GOES-11 as the operational GOES-West spacecraft. Characteristics of the Imager and Sounder are similar from GOES-10 to GOES-11 (except GOES-10 is currently operating in a Yaw Flip mode). Additional information can be found at: http://www.osd.noaa.gov/Gvar/gvardownload.htm ). Ground equipment may require adjustments to satellite id. The plans developed are intended to cause as few disruptions to all users who need to acquire the GOES-11 GVAR signal via a ground antenna. An up to date synopsis: (1) GOES-11 is currently being taken out of Z-axis storage and being moved to the 135 degrees West position. (2) As GOES-11 arrives close to 135 degrees West, GOES-11 data will be flowed through GOES-10 communication links (on or about June 27, 2006), thus, GOES-11 data is operational but received through GOES-10 downlink. Users point to GOES-10 to receive GOES-11 data. At this point GOES-11 data are considered operational, but should significant problems occur, GOES-10 data can be reestablished quickly. (3) As GOES-11 is within 1 degree of GOES-10, will turn off GOES-10 signal, and acquire GOES-11 data directly from GOES-11, not GOES-10. Users should not need to repoint their antenna, as the two satellites are very close. (4) Switch ancillary communication services (DCS, LRIT, EMWIN, SAR) from GOES-10 to GOES-11, **date TBD** (5) Pending the successful launch and checkout of GOES-N (launch scheduled for May 20, 2006), GOES-10 will be moved to 60 degrees West at a rate of 0.6 degrees per day for South American support in October 2006. These intricate steps are necessary to provide a continuous flow of data, with minimal impact to users. There should be no need to readjust antenna unless there is a desire to acquire GOES-11 data prior to GOES-11 becoming operational. (We are awaiting on final plans from OSO/SOCC concerning the startup of GOES-11 INR and GVAR) ---------------------------------------- Contact Information: Brian Hughes Satellite Services Division NOAA/NESDIS/OSDPD 301-763-8051 x106 brian.hughes@xxxxxxxx See http://www.ssd.noaa.gov/PS/SATS/messages.html for this and other satellite related messages. See http://www.ssd.noaa.gov for full GOES scanning schedules. ============================================================================== To unsubscribe nws-changes, visit: http://www.unidata.ucar.edu/mailing-list-delete-form.html ==============================================================================
nws-changes
archives: