NOTICE: This version of the NSF Unidata web site (archive.unidata.ucar.edu) is no longer being updated.
Current content can be found at unidata.ucar.edu.

To learn about what's going on, see About the Archive Site.

20060510: GOES 10-11 updates

NOTE: The nws-changes mailing list is no longer active. The list archives are made available for historical reasons.

Topic: GOES-10 to GOES-11 Transition Plan
Message Issued: May 10, 2006,  1900 UTC
Satellites Impacted: GOES-10 and GOES-11
Products Impacted: GOES-10 and GOES-11 Imager and Sounder Data and
Associated Products including AWIPS
Date/Time of Initial Impact: On or About June 27, 2006.

-----------------------------------------
Details:

***GOES-11 is scheduled to replace GOES-10 as the GOES-West operational
spacecraft on June 27, 2006***
(The exact time to be determined, but likely in the 1800-1900Z time frame)

This message is to provide additional information on a planned
transition from GOES-10 to GOES-11 as the operational GOES-West
spacecraft.  Characteristics of the Imager and Sounder are similar from
GOES-10 to GOES-11 (except GOES-10 is currently operating in a Yaw Flip
mode).  Additional information can be found at:
http://www.osd.noaa.gov/Gvar/gvardownload.htm ). Ground equipment may
require adjustments to satellite id.

The plans developed are intended to cause as few disruptions to all
users who need to acquire the GOES-11 GVAR signal via a ground antenna.

An up to date synopsis:

(1) GOES-11 is currently being taken out of Z-axis storage and being
moved to the 135 degrees West position.

(2) As GOES-11 arrives close to 135 degrees West, GOES-11 data will be
flowed through GOES-10 communication links (on or about June 27, 2006),
thus, GOES-11 data is operational but received  through GOES-10
downlink. Users point to GOES-10 to receive GOES-11 data. At this point
GOES-11 data are considered operational, but should significant problems
occur, GOES-10 data can be reestablished quickly.

(3) As GOES-11 is within 1 degree of GOES-10, will turn off GOES-10
signal, and acquire GOES-11 data directly from GOES-11, not GOES-10.
Users should not need to repoint their antenna, as the two satellites
are very close.

(4) Switch ancillary communication services (DCS, LRIT, EMWIN, SAR) from
GOES-10 to GOES-11,  **date TBD**

(5) Pending the successful launch and checkout of GOES-N (launch
scheduled for May 20, 2006), GOES-10 will be moved to 60 degrees West at
a rate of 0.6 degrees per day for South American support in October 2006.

These intricate steps are necessary to provide a continuous flow of
data, with minimal impact to users. There should be no need to readjust
antenna unless there is a desire to acquire GOES-11 data prior to
GOES-11 becoming operational. (We are awaiting on final plans from
OSO/SOCC concerning the startup of GOES-11 INR and GVAR)

----------------------------------------

Contact Information:
Brian Hughes
Satellite Services Division
NOAA/NESDIS/OSDPD
301-763-8051 x106
brian.hughes@xxxxxxxx

See http://www.ssd.noaa.gov/PS/SATS/messages.html  for this and other
satellite related messages.
See http://www.ssd.noaa.gov  for full GOES scanning schedules.




==============================================================================
To unsubscribe nws-changes, visit:
http://www.unidata.ucar.edu/mailing-list-delete-form.html
==============================================================================


  • 2006 messages navigation, sorted by:
    1. Thread
    2. Subject
    3. Author
    4. Date
    5. ↑ Table Of Contents
  • Search the nws-changes archives: