-------- Original Message --------180 NOUS42 KWNO 290513
ADMNFD SENIOR DUTY METEOROLOGIST NWS ADMINISTRATIVE MESSAGE NWS NCEP CENTRAL OPERATIONS CAMP SPRINGS MD 107 AM EDT FRI MAY 29 2009 WE HAD A PROBLEM WITH THE PRODUCTION MACHINE LOCATED IN FAIRMONT WV. WE SWITCHED PRODUCTION TO THE CCS LOCATED IN GAITHERSBURG MD. DUE TO THE FACT THAT THE 00Z GFS WAS ONLY 5 MINUTES FROM A SUCCESSFUL CONCLUSION SOME OF THE GFS FAILED AND HAVE TO BE RERUN ON THE NEW PRODUCTION MACHINE. HOPEFULLY THERE WONT BE A VERY LONG DELAY. $$ WOOLDRIDGE/SDM/NCO/NCEP