NOTICE: This version of the NSF Unidata web site (archive.unidata.ucar.edu) is no longer being updated.
Current content can be found at unidata.ucar.edu.

To learn about what's going on, see About the Archive Site.

Re: Plot stuck in loop?

Hi Paul,

>   I'm able to plot my data, and following the example in Test30.java
> I've added date/time labels.  However, now that I've made the switch
> from "1, 2, 3" to the date/time labels, it seems one of my sets is
> causing VisAD to go into an infinite loop.  The data set has only 1
> point.  It's a 2D plot, time along the x axis.  The plot begins to draw
> and the y axis appears (correctly drawn), then I get "please wait" in
> the lower left corner and that's it.

I put together a little application that mapped Time to the
XAxis, and displayed a FlatField (Time -> something) with
only one sample, and also displayed a Real of type Time and
a RealTuple that included Time.  All of them displayed OK
without any infinite "please wait".  My app enabled axis
scales.  Could you send me a copy of your application (and
data so I can run it)?

Cheers,
Bill
----------------------------------------------------------
Bill Hibbard, SSEC, 1225 W. Dayton St., Madison, WI  53706
hibbard@xxxxxxxxxxxxxxxxx  608-263-4427  fax: 608-263-6738
http://www.ssec.wisc.edu/~billh/vis.html


  • 2000 messages navigation, sorted by:
    1. Thread
    2. Subject
    3. Author
    4. Date
    5. ↑ Table Of Contents
  • Search the visad archives: